Please select a case study from the list below to view and download details about this project
Do you have a project we could assist you with? If so please call us on
0161 406 5060
or alternatively you can email us at
info@armitage-construction.co.uk
When Armitage were invited to build the new Mini Showroom and Dealership for Blue Bell Mini Crewe, it was made very clear from the outset and all in time for the launch, that the project would be very demanding due to the exacting requirements that would need to be met throughout every phase of the ‘fast –track’ 26 week project.
The contract called for the complete construction of a single storey Mini car showroom with archive storage at first floor level and a sophisticated workshop which included a castrol designed exhaust extraction system and parts storage area to the rear.