Please select a case study from the list below to view and download details about this project
Do you have a project we could assist you with? If so please call us on
0161 406 5060
or alternatively you can email us at
info@armitage-construction.co.uk
The work at Cheadle Glass in Stockport comprised of the construction of a new Production facility with an additional storage area created by the means of a mezzanine floor. Externally, the existing building was refurbished in its entirety by way of re-cladding and re-roofing to create a much improved and updated look. The work was carried out whilst the building was fully occupied and we had to be mindful of areas required for continued access.