Please select a case study from the list below to view and download details about this project
Do you have a project we could assist you with? If so please call us on
0161 406 5060
or alternatively you can email us at
info@armitage-construction.co.uk
The brief from Tameside Metropolitan Borough Council was to construct a two storey extension which included a first floor bridge link to the existing Copley leisure centre and secondary school. Careful programming and supervision was required at all times due to the access constraints and confined location coupled with working in a heavily occupied area.